Novosibirsk · Russian-qualified counsel Recognised by Pravo-300 · Best Lawyers · Kommersant
Cross-border Disputes

Interim measures and asset preservation in Russia under New York Convention Article V(1): key developments in 2026

Vitaliy Vetrov · May 2026 · 9 min read

Russian courts are reframing Article V(1) grounds in interim-measures proceedings. GCs with Russian assets need to act early. Make an enquiry.

Following a series of notable decisions in the first half of 2026, Russian arbitrazh courts have materially shifted the threshold at which they will grant interim measures in proceedings connected to foreign arbitral awards. For in-house counsel at multinational companies with Russian subsidiaries, joint ventures, or trade relationships, this shift carries direct operational consequences. Asset preservation applications that might have succeeded under the approach prevailing through 2024 and 2025 now face a more demanding procedural and substantive review — and the window for securing protection before a counterparty dissipates or encumbers Russian assets is narrower than many foreign GCs assume.

§ I. What changed in Russian interim-measures practice in 2026?

Since the early 2010s, Russian arbitrazh courts have applied the New York Convention's Article V(1) grounds primarily in the context of recognition and enforcement applications. The question of how, and whether, those same grounds should inform the court's discretion at the interim-measures stage — before a final award is recognised — has been contested terrain. Through most of the decade, courts in the Siberian, Ural, and Moscow circuits took broadly distinct approaches, with some treating Article V(1) as a threshold gateway for interim relief and others declining to apply it at the pre-recognition stage at all.

By mid-2026, the prevailing approach has converged, in most circuits, toward a position that treats Article V(1) compliance as a relevant, though not necessarily determinative, factor at the interim-relief stage. In practice, this means that a foreign company or creditor applying to a Russian arbitrazh court for asset-preservation measures — pending enforcement of a foreign arbitral award — can now expect the court to examine, at least preliminarily, whether grounds exist that might later defeat recognition of that award. An application that cannot demonstrate, on its face, that the award is unlikely to encounter an Article V(1) objection will face a materially higher burden.

The practical effect is felt most acutely in three areas. First, applications where the underlying arbitration seated outside Russia involved procedural irregularities — however minor — are now being scrutinised more carefully at the interim stage. Second, awards arising from arbitral institutions whose relationship with the Russian legal system has been the subject of ongoing jurisdictional debate face greater initial resistance. Third, applications filed in circuits where local courts have developed a more sceptical posture toward foreign arbitral awards encounter both longer processing times and a higher rate of preliminary refusal.

§ II. How are Russian courts interpreting Article V(1) in 2026?

The interpretive development that most distinguishes 2026 from prior years is the willingness of courts to conduct what practitioners have described as a pre-emptive refusal-grounds review. Rather than deferring all Article V(1) analysis to the recognition hearing, courts are now, in practice, asking whether the award carries visible markers of a potential enforcement problem. This is not, formally, a merits review. Courts have been careful — in the decisions available to practitioners — to frame this as an assessment of the likelihood that interim relief will serve a legitimate protective purpose.

"The trend in Russian arbitrazh courts during 2026 is not a departure from the New York Convention — it is, in effect, a front-loading of the analysis that the Convention already requires at the recognition stage."

— Vitaliy Vetrov, Managing Partner, Vetrov & Partners

The practical consequence for foreign companies is that the quality of the interim-measures application itself has become significantly more important. An application filed without a clear account of the award's procedural history, the composition of the tribunal, and the basis on which Article V(1) grounds are inapplicable will be at a structural disadvantage. Courts have shown limited patience for applications that treat interim relief as a matter of procedural routine — as something to be obtained quickly, without substantive engagement with the Convention framework.

For in-house counsel managing a Russian subsidiary or asset portfolio, the regulatory shift reinforces a straightforward risk: delay in preparing a well-documented interim-measures application, or reliance on an application template designed for a pre-2026 procedural environment, may result in an avoidable refusal — and a counterparty that has used the additional time to restructure its asset position.

If your company holds a foreign arbitral award and is considering asset-preservation steps in Russia, make an enquiry before the application stage: info@vetrovpartners.com |

§ III. Which foreign companies are most exposed under the new approach?

The practical exposure is not evenly distributed. Companies most directly affected are those holding awards from institutional arbitrations seated in jurisdictions whose arbitral procedures differ structurally from Russian procedural norms — which, in practice, covers a wide range of ICC, LCIA, and SCC proceedings. The courts' preliminary review does not treat these institutional differences as disqualifying, but it does mean that counsel must be prepared to address procedural distinctions affirmatively, rather than assuming institutional reputation alone is sufficient.

Foreign companies operating through Russian subsidiaries, or holding pledges or security interests over Russian real property or business assets, face an additional dimension. Where interim relief is sought not merely to preserve value pending recognition, but also to prevent a restructuring or insolvency filing by the Russian entity, the interaction between the asset-preservation regime and Russian insolvency legislation becomes material. Courts in the Siberian and Ural circuits have, in a number of recent matters, declined to grant interim measures where the practical effect would have been to circumvent the statutory priority rules of Russian insolvency legislation. Foreign creditors should take advice on this intersection before filing.

The Cross-border Disputes & Arbitration practice at Vetrov & Partners has acted in a number of interim-measures applications before the Siberian Federal District arbitrazh courts in 2025 and 2026. In one recent matter, the firm acted for a European trade creditor seeking preservation of Russian assets pending recognition of an ICC award. The application succeeded, but required a more detailed procedural framing than equivalent applications had required in prior years — a pattern consistent with the broader 2026 trend described in this article.

Foreign companies that have not yet taken steps to protect Russian assets — and that hold awards or pending claims with significant Russian exposure — should consider their position carefully. Under Russian civil procedure, creditor-side delay in securing interim relief can result in the permanent loss of an effective preservation mechanism, with consequences that are difficult to reverse once the relevant assets have changed form or been transferred.

For further context on the strategic considerations that arise when pursuing interim relief in cross-border proceedings, see Strategic Considerations in Interim Measures and our overview of Interim Measures and Asset Preservation in Russia.

For companies with pending or anticipated enforcement proceedings in Russia — discuss your position in confidence: info@vetrovpartners.com |

§ IV. Open questions and what to watch for in the remainder of 2026

Several important questions remain unresolved as of October 2026. The most significant is whether the Supreme Court of the Russian Federation will issue clarifying guidance on the relationship between Article V(1) and interim relief — either through a dedicated resolution or through the reasoning of a case considered by the Economic Collegium. Practitioners in the cross-border disputes community have noted that the current circuit divergence, while narrowed, has not been eliminated. Courts in some districts continue to treat the Article V(1) analysis as strictly post-award, refusing to apply it at the interim stage at all.

A second open question concerns the burden of proof at the interim stage. The current practice in most circuits places the practical burden on the applicant to demonstrate that Article V(1) grounds are unlikely to apply — but the formal procedural rules do not clearly allocate this burden. Until the Supreme Court or a consistent body of appellate authority settles the question, applicants should proceed on the assumption that they bear the burden, and structure applications accordingly.

Foreign companies should also monitor developments in EAEU and CIS jurisdictions, given the relevance of the interim-measures frameworks in those systems to cross-border enforcement strategies involving Russian counterparties. Russia's EAEU membership shapes certain procedural aspects of cross-border asset recovery that interact with, and in some respects complement, the New York Convention framework. A coordinated strategy — addressing both the Russian domestic interim-measures application and any parallel EAEU or CIS enforcement steps — is, in the firm's experience, materially more effective than treating each jurisdiction independently.

For a review of pending or anticipated enforcement matters involving Russian assets, our matters portfolio illustrates the range of cross-border contexts in which the firm has advised.

Frequently asked questions

Q: What specifically changed in how Russian courts apply Article V(1) to interim-measures applications in 2026?

A: The principal development is what practitioners describe as a pre-emptive refusal-grounds review at the interim stage. Russian arbitrazh courts in most circuits are now willing to examine, at the point of the interim-measures application, whether the underlying foreign arbitral award shows markers of a potential Article V(1) enforcement problem. Previously, most circuits deferred this analysis entirely to the recognition hearing. The practical result is that applications must now address Article V(1) compliance affirmatively, with supporting procedural documentation, rather than treating interim relief as a procedurally straightforward step.

Q: Which types of foreign companies are most directly affected by this shift?

A: The change most directly affects companies holding foreign institutional arbitral awards — particularly from ICC, LCIA, SCC, or similar proceedings — where the arbitration procedures differ in structure from Russian procedural norms. Companies with Russian subsidiaries or real-property security interests face an additional layer of exposure at the intersection of interim-measures law and Russian insolvency legislation. Companies operating in the Siberian and Ural circuits, where local courts have developed a more cautious posture toward certain foreign awards, should factor in longer processing times and a more demanding substantive review.

Q: What should in-house counsel do now to protect Russian assets in light of this development?

A: The immediate priority is to audit any foreign arbitral award — or pending arbitral proceedings with a Russian enforcement dimension — against the Article V(1) grounds framework, specifically to identify any procedural features of the underlying arbitration that a Russian court might flag at the interim stage. Applications should be prepared with a full procedural narrative and, where possible, a pre-emptive response to likely Article V(1) objections. Given that creditor-side delay carries real procedural risk under Russian civil procedure, this preparation should begin well before the intended filing date. Taking advice from Russian qualified counsel at the strategy stage — before the application is drafted — is, in the firm's experience, the most effective way to reduce the risk of an avoidable refusal.

Practitioner note

This briefing is general information and does not constitute legal advice. For advice on a specific matter, write in confidence to info@vetrovpartners.com.

Facing a matter like this?

Our team advises foreign clients on exactly these questions across Russia and the EAEU region. Initial 30-minute consultation — complimentary.

Make an enquiry